BARO_AKOBO-SOBAT(BAS)Multipurpose Water Resource Development Study
Permanent URI for this collection
Browse
Browsing BARO_AKOBO-SOBAT(BAS)Multipurpose Water Resource Development Study by Issue Date
Now showing 1 - 20 of 21
Results Per Page
Sort Options
- PublicationBAS and White Nile MWRDS Project, Baseline Information(2008)Baseline study report that describes the hydrology, temperature, evaporation, catchments, Machar Marshes, groundwater, floods, irrigation and drainage, hydropower potential, navigation, livelihood and natural resources, social set up and institutional arrangements, and environment of the Baro-Akobo-Sobat (BAS) project region.
- PublicationBAS MWRDS Project, Report on the Planning Workshop(2009)This reports on the second national-level consultative workshop held to (1) introduce the BAS MWRDS project, under the regional framework for cooperation on the Nile waters, and the guiding principles of its parent program, the Eastern Nile Subsidiary Action Program (ENSAP), which is part of the Nile Basin Initiative (NBI); and to (2) understand the water resources, social, environmental and climate change issues in the BAS region from local perspectives.
- PublicationBAS MWRDS, Approach Paper to Project Study(2011)Muso, JacksonApproach Paper to the BAS project that details its main objectives, to (1) develop BAS water resources in a sustainable (no harm and no regret), and equitable manner that ensures prosperity, security, and peace for all its peoples; (2) ensure efficient water management and the optimal use of the resources; (3) ensure cooperation and joint action among Eastern Nile Countries, seeking win-win gains; (4) target poverty eradication and promote social and economic integration; and (5) ensure that movement from planning to action.
- PublicationBAS MWRDS, Scoping Study Report(2016-02)Report detailing the findings of the Scoping Study in the Baro-Akobo-Sobat (BAS) sub-basin, as part of the BAS Multi-Purpose Water Resource Development Study. It identifies sector-wise sources of information, details the scope of work for the basin-wide approach adopted, and identifies the scope of work for potential and planned interventions, including information gaps and ways to plug the gaps.
- PublicationBAS MWRDS, Consultation and Communication Plan(2016-02)Report from the BAS Multi-Purpose Water Resource Development Study that documents the process of consultation with key stakeholders for project implementation at different levels and different phases, and the communication process to implement the time-bound projects selected under the Integrated Water Resources Development and Management Plan being prepared for the BAS sub-basin.
- PublicationBAS MWRDS, Inception Report(2016-02)Inception Report of the Baro-Akobo-Sobat Multi-Purpose Water Resource Development Study that outlines the context, describes the activities carried out during the Inception Phase, the scoping exercises carried out and preliminary findings, component-wise methodology going forward, progress on developing the consultation and communication plan, the work programme, staffing and staff deployment.
- PublicationBAS MWRDS, Baseline, Development Potential, Key Issues and Objectives Report, Annex 1: Physical environment(2016-03)Annex supporting the Report of the Baseline Study in the Baro-Akobo-Sobat (BAS) sub-basin, as part of the BAS Multi-Purpose Water Resource Development Study. It details the development of a sediment yield map for the study area of BAS sub-basin, including the detailed methodology followed using the SHETRAN model.
- PublicationBARO AKOBO SOBAT MULTIPURPOSE WATER RESOURCES DEVELOPMENT STUDY - Strategic Social and Environmental Assessment(2016-04)Report of the Strategic Environmental and Social Assessment carried out in the Baro-Akobo-Sobat (BAS) sub-basin, as part of the BAS Multi-Purpose Water Resources Development Study. It aims to integrate strategic environmental and social considerations into the Integrated Water Resources Development and Management (IWRDM) Plan being prepared for the BAS sub-basin.
- PublicationBAS MWRDS, Baseline, Development Potential, Key Issues and Objectives Report, Annex 4: Policies, legal and institutional arrangements in the Basin(2016-04)Annex supporting the Report of the Baseline Study in the Baro-Akobo-Sobat (BAS) sub-basin, as part of the BAS Multi-Purpose Water Resource Development Study. It describes the current institutional background and framework at national and international levels, identifies key issues, preliminary ideas for the future, administrative, legal and institutional arrangements, and analyses issues affecting the multipurpose water resources development plan for the BAS sub-basin.
- PublicationBAS MWRDS, Baseline, Development Potential, Key Issues and Objectives Report, Annex 3: Socio-economic environment(2016-05)Annex supporting the Report of the Baseline Study in the Baro-Akobo-Sobat (BAS) sub-basin, as part of the BAS Multi-Purpose Water Resource Development Study. It describes the socio-economic environment (population, education and health, gender, social structure and design, conflicts, land tenure, economic status, infrastructure and agricultural markets) in the Ethiopian and South Sudanese part of the BAS basin, and key issues, challenges and opportunities of the basin.
- PublicationBAS MWRDS, Baseline, Development Potential, Key Issues and Objectives Report, Annex 2: Biological environment(2016-05)Annex supporting the Report of the Baseline Study in the Baro-Akobo-Sobat (BAS) sub-basin, as part of the BAS Multi-Purpose Water Resource Development Study. It describes the basin’s socio-environmental set up and identifies existing and potential challenges to its natural and social environment. It attempts to obtain local knowledge and indicates how to conserve the fragile environment of the basin and integrate environmental issues in the proposed integrated water resource development plan of the BAS sub-basin.
- PublicationWater Resources Development Study Project Atlas and Maps(2017-05)The complete Atlas of Maps of the BAS region, including physical and other aspects, produced as part of the Baro-Akobo-Sobat Multipurpose Water Resources Development Study by ENTRO.
- PublicationBARO AKOBO SOBAT MULTIPURPOSE WATER RESOURCES DEVELOPMENT STUDY - Integrated Water Resources Development and Management Plan(2017-07)IWRDM Plan for the Baro-Akobo-Sobat (BAS) sub-basin produced by the Baro-Akobo-Sobat Multi-Purpose Water Resource Development Study, that details a shared vision of the future development of the sub-basin as well as the strategic objectives required to reach this vision. Based on an Options Analysis, it identifies strategic options, and develops strategic actions to achieve the objectives. After detailing the specific actions related to each strategic objective, it discusses an implementation strategy (principles and schedule), carries out a Cost Benefit Analysis of the Plan and recommends an institutional framework (roadmap) to implement the Plan.
- PublicationBAS MWRDS, Baseline, Development Potential, Key Issues and Objectives Report, Annex 5: Water Balance(3/1/2016)Annex supporting the Report of the Baseline Study in the Baro-Akobo-Sobat (BAS) sub-basin, as part of the BAS Multi-Purpose Water Resource Development Study. It describes the findings of the water balance study carried out in the BAS sub-basin.
- PublicationBAS MPWRDS, Integrated Water Resources Development and Management Plan(4/1/2017)IWRDM Plan for the Baro-Akobo-Sobat (BAS) sub-basin produced by the Baro-Akobo-Sobat Multi-Purpose Water Resource Development Study, that details a shared vision of the future development of the sub-basin as well as the strategic objectives required to reach this vision. Based on an Options Analysis, it identifies strategic options, and develops strategic actions to achieve the objectives. After detailing the specific actions related to each strategic objective, it discusses an implementation strategy (principles and schedule), carries out a Cost Benefit Analysis of the Plan and recommends an institutional framework (roadmap) to implement the Plan.
- PublicationBAS MWRDS: Strategic Social and Environmental Assessment(7/1/2017)Report of the Strategic Environmental and Social Assessment carried out in the Baro-Akobo-Sobat (BAS) sub-basin, as part of the BAS Multi-Purpose Water Resources Development Study. It aims to integrate strategic environmental and social considerations into the Integrated Water Resources Development and Management (IWRDM) Plan being prepared for the BAS sub-basin.
- PublicationBAS MPWRDSP: Medium & Long-Term Projects Brochure(7/30/2017)Brochure profiling the nine medium and long-term projects profiled and included in the Integrated Water Resources Development and Management Plan developed for the Baro-Akobo-Sobat (BAS) sub-basin. All nine are planned for implementation in the next 10 years, with the recommendation to implement them without delay. Of these, three were shortlisted by the stakeholders, and detailed Terms of Reference were prepared as part of the BAS Multi-Purpose Water Resources Development Study of ENTRO.
- PublicationBAS MPWRDS: Feasibility Study: Kinyeti River Multi-Purpose Development(7/30/2017)Feasibility Study detailing the context, project area, assessment of water resources and justification of the project, project design (multipurpose reservoir, hydropower production, potable water supply for Torit, fisheries, irrigation, aquaculture, livestock watering and watershed management), potential environmental and social impacts, cost-benefit analysis, conclusions, and recommendations. This is an output of the Baro-Akobo-Sobat Multi-Purpose Water Resources Development Study by ENTRO.
- PublicationBAS MPWRDS: Akobo Gambella Floodplains Transboundary Development Design(7/30/2017)Design Study detailing the context, project area, details of programme components (preliminary, preparatory and implementation phases), description of components (installation of solar equipment, potable water supply and sanitation, livestock watering, capture fisheries and aquaculture, small-scale irrigation and capacity building) potential environmental and social impacts, assessment of costs and benefits, conclusions and recommendations. This is an output of the Baro-Akobo-Sobat Multi-Purpose Water Resources Development Study by ENTRO.
- PublicationBAS MPWRDS: Feasibility Study: Majang Multi-Purpose Project(7/30/2017)Feasibility Study detailing the context, project area, project design (hydropower, aquaculture, irrigation, and watershed management), potential environmental and social impacts, cost-benefit analysis, conclusions, and recommendations. This is an output of the Baro-Akobo-Sobat Multi-Purpose Water Resources Development Study by ENTRO.