Options
ABBAY river basin integrated development master Plan project. PHASE 2. Data Collection Site investigation survey and analysis. SECTION II- Sectoral Studies. Natural Resources Part I- Geology Part 2- Mineral Resources Vol. I
Date Issued
1998
Status
Limited Access
Abstract
This report is the result of an evaluation mission in Ethiopia performed during the phase 1 of the project in February 1995 in Addis Ababa, and of the mission and field control trips performed in the framework of the phase 2 of the study February 24th 1997.
ENTRO Subjects
WATER RESOURCE MANAGEMENT/PLANNING
Country